Our process often achieves significant savings and operational benefits for pipeline companies, because the coating is applied in one continuous pass (per section) from start to finish after the field joints are welded. Companies find lower capital costs and improved coating integrity, reduced timeline when compared to shop coating the line pipe and manually coating the field joints after welding, and improved flow efficiency.
The in situ coating process results in homogeneous coating over weld joints, all bends, pitting, and any weld or minor corrosion defects. The proactively coated lines are less susceptible to corrosion should the inhibitor programme or system fail.
Below is a list of some of our many successful projects from the last decade.
Brooks, AB
Insitu cleaned and coated ~1.9kms of NPS3 existing oil emulsion pipeline. Highland 74IS.
Meota, SK
Insitu cleaned and coated ~5.8kms of NPS8 new raw water pipeline. Devoe Bar-Rust 236.
Insitu cleaned and coated ~2.05kms of NPS10 new raw water pipeline. Devoe Bar-Rust 236.
Tilley, AB
Insitu cleaned and coated ~2.1kms of 4" existing oil emulsion pipeline. Highland 74IS.
Meota, SK
Insitu cleaned and coated 10kms of 8" new raw water pipeline. International Bar-Rust 236.
Meota, SK
Insitu cleaned and coated 8kms of 8" new raw water pipeline. International Bar-Rust 236.
Saddle Hills, AB
Insitu cleaned and coated 2.7kms of 8" new pipeline. Highland 74IS.
Fox Creek, AB
Insitu cleaned and coated 2.4kms of existing 6" oil emulsion pipeline. International Bar-Rust 236.
Saddle Hills, AB
Insitu cleaned and coated 2.9kms of 8” new pipeline. Highland 74IS.
Spirit River, AB
Insitu cleaned and coated 7.5kms of 8” new pipeline. Highland 74IS.
Spirit River, AB
Insitu cleaned and coated 7.5kms of 12” new pipeline. Highland 74IS.
Spirit River, AB
Insitu cleaned and coated 2kms of 6” new pipeline. Highland 74IS.
Myton, Utah
Insitu clean and coat 1.1kms and 1.7kms of 6” existing oil emulsion pipelines. Highland 74IS.
Spirit River, AB
Insitu cleaned and coated 3.6kms of 10” new water injection line. Highland 74IS.
Meota, SK
Insitu cleaned and coated 8.7kms of 8” new water injection line. International Bar-Rust 236.
Earring, AB
Insitu cleaned and coated 2.45 miles of 10” new pipeline. Highland 74IS.
Earring, AB
Insitu cleaned and coated 0.54 miles of 10” new pipeline. Highland 74IS.
Spirit River, AB
Insitu cleaned and coated 3.01 miles of 8” new pipeline. Highland 74IS.
Dawson Creek, BC
Insitu cleaned and coated 1.49 miles of 4” existing produced water pipeline. Highland 74IS.
North Slope, Alaska
Insitu clean and coat 5.6kms of 10” existing oil emulsion pipeline. International Bar-Rust 236
Earring, Alberta
Insitu clean and coat 15kms of 10” existing oil emulsion pipeline. Highland 74IS.
Fox Creek, AB
Insitu clean and coat 2.11 miles of 10” existing emulsion pipeline. Highland 74IS.
Valleyview, AB
Insitu cleaned and coated 1.86 miles of 6” existing pipeline. Highland 74IS.
Spirit River, AB
Insitu clean and coat 3.8kms of 8” new pipeline. Highland 74IS.
Spirit River, AB
Insitu clean and coat 2.36 miles of 8” new pipeline. Highland 74IS.
Spirit River, AB
Insitu clean and coat 7.23 miles of 8” new pipeline. Highland 74IS.
Spirit River, AB
Insitu clean and coat 1.32 miles of 8” new oil effluent pipeline. Highland 74IS.
Joffre, AB
Insitu clean 0.93 miles of 4” pipeline.
Dawson Creek, BC
Insitu cleaned and coated 1.39 miles of 3" produced water. International Bar-Rust 236.
Mulligan, AB
Insitu cleaned and coated 1.82 miles of 6" produced water. Highland 74IS.
Elnora, AB
Insitu cleaned and coated 1.03 miles of 3" water injection line. Highland 74IS.
Pink Mountain, BC
Insitu cleaned and coated 3kms of 8" water line. International Bar-Rust 236.
Mulligan, AB
Insitu cleaned and coated 0.75 miles of 4" water disposal line. Highland 74IS.
Mulligan, AB
Insitu cleaned and coated 1.82 miles of 6" produced emulsion. Highland 74IS.
Mulligan, AB
Insitu cleaned and coated 1.74 miles of 8" produced emulsion line. Highland 74IS.
Mulligan, AB
Insitu cleaned and coated 3.10 miles of 8" produced emulsion line. Highland 74IS
Hythe, AB
Insitu cleaned and coated 0.34 miles of 3" oil line. International Bar-Rust 236.
Earring, AB
Insitu cleaned and coated 0.96 miles of 8" oil line. Highland 74IS.
Mulligan, AB
Insitu cleaned and coated 1.82 miles of 6" fuel gas line. Highland 74IS.
Mulligan, AB
Insitu cleaned and coated 1.74 miles of 6" produced gas pipeline. Highland 74IS.
Grande Prairie, AB
Insitu cleaned and inhibited 5.59 miles of 8" existing pipeline.
Myton, Utah
In-situ cleaned and coated 4.26 miles meters of 6" produced water line. International Bar-Rust 236.
Fourth Creek, AB
Insitu cleaned and coated 1.92 miles of 6" produced water line. Highland 74IS.
Fourth Creek, AB
Insitu cleaned and coated 1.74 miles of 6" produced water line. Highland 74IS.
Fourth Creek, AB
Insitu cleaned and coated 5260 meters of 6" produced water line. Highland 74IS.
Hythe, AB
In-situ cleaned and coated 1.68 miles of 3" water injection line. International Bar-Rust 236.
Hythe, AB
In-situ cleaned and coated 0.39 miles of 3" water injection line. International Bar-Rust 236.
Spirit River, AB
In-situ cleaned and coated 1.11 miles of 4" new water injection line. Highland 74IS.
Spirit River, AB
In-situ cleaned and coated 2.24 miles of 4" new water injection line. Highland 74IS.
Fourth Creek, AB
In-situ cleaned and coated 2.45 miles of 4" water injection line. Highland 74IS.
Fourth Creek, AB
In-situ cleaned and coated 2.05 miles of 4" water injection line. Highland 74IS.
Spirit River, AB
Insitu cleaned and coated 1.42 miles of 4" new water injection line. Highland 74IS.
Brooks, AB
Insitu cleaned and coated 2.05 miles of 3" oil emulsion line. International Bar-Rust 236.
Brooks, AB
Insitu cleaned and coated 2.01 miles of 3" oil emulsion line. International Bar-Rust 236.
Brooks, AB
Insitu cleaned and coated 1.24 miles of 3" oil emulsion line. International Bar-Rust 236.
Brooks, AB
Insitu cleaned and coated 0.67 miles of 3" oil emulsion line. International Bar-Rust 236.
Fourth Creek, AB
Insitu cleaned and coated 1.92 miles of 8" produced emulsion line. Highland 74IS.
Fourth Creek, AB
Insitu cleaned and coated 1.73 miles of 6" produced emulsion line. Highland 74IS.
Fourth Creek, AB
Insitu cleaned and coated 3.26 miles of 6" produced emulsion line. Highland 74IS.
Ponoka, AB
Insitu cleaned and coated 1.49 miles of 3" oil line. Highland 74IS.
Zama Lake, AB
Insitu cleaned and coated 1.09 miles of 6" oil line.
Zama Lake, AB
Insitu cleaned and coated 2.57 miles of 3" existing oil line.
Joffre, AB
In-situ cleaned and coated 0.53 miles of 10" cooling water line within a plant setting. Highland 74IS.
Zama Lake, AB
Insitu cleaned and coated 3.89 miles of 6" existing sour gas line.
Fourth Creek, AB
Insitu cleaned and coated 3.27 miles of 6" produced gas line. Highland 74IS.
Grande Prairie, AB
In-situ cleaned and inhibited 2.73 miles of 6" pipeline.
Hythe, AB
In-situ cleaned and coated 0.74 miles of 3" water injection line.
Utah, USA
In-situ cleaned and coated 8.70 miles of 6" water injection line.
Spirit River, AB
In-situ cleaned and coated 5.90 Miles of 4" new carbon steel water injection line.
Ponoka, AB
In-situ cleaned and coated 1.24 miles of 4" CO2 line, 1 km of 6" CO2 line.
Buffalo, AB
In-situ cleaned and coated 0.93 miles of 4" gas line.
Joffre, AB
In-situ cleaned and coated 0.77 miles of 8" spent acid line within a plant setting.
Buffalo, AB
In-situ cleaned and coated 0.93 miles of 4" gas line.
Joffre, AB
In-situ cleaned and coated 0.77 miles of 8" spent acid line within a plant setting.
Joffre, AB
In-situ cleaned and coated 0.34 miles of 16" water line within a plant setting.
Joffre, AB
In-situ cleaned and coated 0.49 miles of 14" water line within a plant setting.
Slave Lake, AB
In-situ cleaned and coated 0.17 miles of 6" water line.
Winfield, AB
In-situ cleaned and coated 1.49 miles of 6" oil line.
Winfield, AB
In-situ cleaned and coated 1.99 miles of 6" oil line.
Joffre, AB
In-situ cleaned and coated 0.49 miles of 8" water line within a plant setting.
Kerrobert, Saskatchewan
0
In-situ cleaned and coated 1.79 miles of 8" oil line.
Ponoka, AB
In-situ cleaned and coated 1.62 miles of 4" CO2 line.
Ponoka, AB
In-situ cleaned and coated 2.48 miles of 4" CO2 line.
Ponoka, AB
In-situ cleaned and coated 1.60 miles of 4" CO2 line.
Ponoka, AB
In-situ cleaned and coated 0.93 miles of 3" CO2 line.
Ponoka, AB
In-situ cleaned and coated 0.93 miles of 4" CO2 line.
Lodgepole, AB
In-situ cleaned and coated 0.17 miles of 4" sour gas line.
Winfield, AB
In-situ cleaned and coated 3.16 miles of 8" oil line.
Winfield, AB
In-situ cleaned and coated 1.55 miles of 6" oil line.
Winfield, AB
In-situ cleaned and coated 1.30 miles of 4" oil line.
Winfield, AB
In-situ cleaned and coated 1.12 miles of 4" oil line.
Winfield, AB
In-situ cleaned and coated 0.75 miles of 3" oil line.
Winfield, AB
In-situ cleaned and coated 0.50 miles 3" oil line.
Joffre, AB
In-situ cleaned and coated 1.12 miles of 16" cooling water line within a plant setting
Drayton Valley, AB
In-situ cleaned and coated 0.62 miles of 4" water injection line.